1 Siltronic CZ Project - Process Cooling Water System , Chilled Water System , Condenser Water System, Process Water, Newater, Recycle Water and Diesel Piping installation , testing & commissioning 2018-2019 Park Rd, #02-00, Singapore Exyte
2 Micron 10A - New Compressed Air Plant System – Compressed Air Piping ( Schedule Pipe ) , Chilled Water Piping and Condenser Water Piping , Vent Piping for Compressor Relief installation , testing and commissioning. Include Common Pipe Support Struct 2018-2019 42 Benoi Rd, Singapore Ingersoll - Rand
3 Institute of Microelectronics - Upgrading Existing Process Cooling Water, Compressed Air and Process Vacuum System. All Existing Pump, Heat Exchanger, Filter, Compressor, Dryer etc is replaced to a higher capacity. Process Cooling Water Piping, Chil 2018-2019 1 Jln Kilang Timor, Pacific Tech Centre, Singapore Takasago
4 Changi Air Terminal 1 - Chilled Water Piping installation , testing commissioning including shut-down piping modification and diversion works and installation of new FCUs 2018 15A Changi Business Park Central 1, #03-04 Eightrium, Singapore Takenaka
5 Wyeth - Chilled Water Piping and Hot Water Piping installation, testing commissioning for new AHU. New AHU Stainless Steel ducting all welded joint installation serving to new Cleanroom 2017-2018 29 Mandai Estate, Singapore Puritec
6 IO Datacenter - Chilled Water Piping installation , testing & commissioning for new Chiller Plant room ( Chiller – 2 set ) with main header to existing Data Hall and FCUs & CRACs for Electrical rooms 2016-2017 10 Tagore Dr, Wah Loon Building, Singapore Wah Loon
7 One Net Datacenter - Chilled Water Piping installation , testing & commissioning for new Chiller Plant room ( Chiller – 3 set & future 2set ) and all distribution piping and Two Level of Data Hall ( CRAC – 72 set ) 2015 10 Tagore Dr, Wah Loon Building, Singapore Wah Loon
8 Equinix ( SG3 ) Phase 2 - Chilled Water Piping installation , testing & commissioning for Chiller Plant room ( Add Chillers x 2 sets ) and two Level of Data Hall ( CRAC ? 72set & FCUs – 80set ) 2015 10 Tagore Dr, Wah Loon Building, Singapore Wah Loon
9 Equinix ( SG3 ) - Chilled Water Piping installation , testing & commissioning for new Chiller Plant room ( Chiller – 2set & future 4set ) , all distribution piping and one Level of Data Hall ( CRAC ? 46set ) & FCUs – 100set 2014 10 Tagore Dr, Wah Loon Building, Singapore Wah Loon
10 Norvatis - Stainless Steel Process Piping installation, testing & commissioning for Air System ( Compressed Air Piping, Industrial Air Piping and Process Nitrogen ) , Chemical ( Acid and NaOH ) , Water ( Process and Portable Water ) and Process Drain 2014 19 Kaki Bukit Cres, Singapore Techniques
11 White Sand - Chilled Water Piping installation , testing & commissioning for Chiller Plant room ( Chiller – 3 set ) and installation of FCUs ( 150 set ) , AHU & PAHU ( 90 sets ) 2014 #02-07 Entrepreneur Business Centre, Singapore Gennal
12 Singtel Datacenter - Chilled Water Piping installation , testing & commissioning for Chiller Plant room ( Chiller - 3 set ) and Three Level of Data Hall ( CRAC Unit ? 120set ) & FCUs ( 80set ). 2011-2012 10 Tagore Dr, Wah Loon Building, Singapore Wah Loon
13 DRT - Chilled Water Piping installation , testing & commissioning for Level 2 & 4 Data Hall 2010 16 International Business Park Rd, #03-00, Singapore Lead Mgt
14 Equinix ( SG2 ) - Chilled Water Piping installation , testing & commissioning Chiller Plant room ( Chiller - 4set ) 2010 10 Tagore Dr, Wah Loon Building, Singapore Wah Loon
15 REC - Chilled Water Piping installation on external pipe rack from Chiller Plant to all buildings including Wafer, Cell and Module Buildings. Main distribution pipe size is diameter 1100mm 2009 19 Kaki Bukit Cres, Singapore Techniques